Final AIA G702 and G703 pay applications
NEW CONSTRUCTION COST SEGREGATION
Updated October 24, 2026 · Individual tax treatment requires CPA review
Can a newly constructed rental use cost segregation? Potentially, after costs and timing are supported.
A newly constructed rental or business property can potentially use cost segregation. The final study should start with supported capitalized construction costs, exclude land, separate equipment already scheduled elsewhere and use the correct placed-in-service date. Detailed records often make new construction easier to reconcile than a later purchase estimate, but the contractor budget alone is not final tax basis.
- ✓ Free quote before payment
- ✓ Scope confirmed in writing
- ✓ California statewide
WHY IT MATTERS
Start with the facts. Confirm the scope.
The IRS Cost Segregation Audit Technique Guide tells examiners to review final contractor pay applications, including AIA G702 and G703 forms, and to test costs outside those applications, such as change orders, indirect costs and owner-paid items. Plans and specifications help connect each cost to the component and function being classified. Depreciation begins when property is ready and available for its intended use, which may differ from the day construction spending stops or a certificate is issued. A phased building, separately completed improvement or owner-purchased asset may have its own placed-in-service facts. The study supports asset classification and cost reconciliation; your CPA determines capitalization, filing elections, deduction limits and the separate California schedule.
Plain English: you are not creating a new deduction. You are identifying when supported pieces of the property may be depreciated.
Primary guidance: IRS Cost Segregation Audit Technique Guide: construction documents and cost reconciliation · IRS Publication 946: depreciable property and placed-in-service rules · IRS Publication 551: basis and costs of produced property
YEAR 1 COMPARISON
Regular depreciation versus accelerated depreciation.
Regular schedule: the calculator estimates Year 1 federal depreciation using the building recovery period and placed-in-service assumptions shown with the result.
With cost segregation: the same calculator applies its approved shorter-life allocation and federal bonus-depreciation assumptions, then shows the extra estimated Year 1 deduction and tax savings. Move the inputs below to compare both paths; the result is a planning estimate, not a customer fact or guaranteed deduction.
Usability check: For an early screen, use a planning amount that reflects expected capitalized building and improvement costs rather than the land value, loan amount or total development budget. The calculator applies its approved property-type and federal bonus assumptions to that input. It does not reconcile contractor costs, determine which indirect costs are capitalized, classify individual components, establish phased placed-in-service dates, calculate California adjustments or decide whether your return can use the deduction.
FREE SAVINGS CALCULATOR
How much more could you save in Year 1?
Move the sliders. See the difference. Get a free quote.
Cost segregation helps you deduct eligible property costs sooner. That may lower your taxes now. Choose your property type, purchase price and federal tax rate to compare estimated Year 1 tax savings. No email, documents or payment are needed to see the result.
An engineering based study reviews property records, components and supporting cost estimates to prepare depreciation schedules your CPA can use. This calculator gives a first look using broad property assumptions; the completed study replaces those assumptions with supported property facts.
Extra Year 1 tax savings
$50,280Estimated additional federal tax savings from cost segregation.
Compare Year 1 tax savings
Share your property and contact details for a free personalized quote by email. Standard estimates and custom scopes are reviewed separately from your tax savings.
No payment, documents or card required.
Estimate only. Assumes eligible property and deductions you can use. Actual results vary.
How it’s calculated
$61,627 with cost seg − $11,347 without = $50,280 extra tax savings. Figures are rounded to whole dollars so the comparison adds up.
The underlying Year 1 deductions are $30,667 without a study and $166,560 with a study. Multiply each deduction by your 37% federal tax rate to estimate the tax savings shown above.
Assumes 20% land, 16% of the building assigned to shorter life assets, and 100% federal bonus depreciation on eligible assets acquired and first used after January 19, 2025. The comparison uses a January start and 27.5 year building depreciation. The treatment of short term rentals depends on actual use.
Extra tax savings means the extra deduction multiplied by your 37% federal tax rate. This moves deductions forward; it does not increase the total cost you can deduct. State taxes, study fees and taxes on a later sale are excluded. Your CPA confirms the actual treatment and usable deductions.
IRS depreciation guidanceWHAT WE REVIEW
New-construction records to preserve
Plans, specifications and construction-detail sheets
Change orders, allowances, retainage and contractor closeout
Architectural, engineering and other indirect-cost support
Owner-purchased equipment and costs outside the main contract
Completion, occupancy and placed-in-service evidence by phase
DOES IT FIT?
Strong candidates usually have four things.
The completed property is held for rental or business use
Final capitalized basis can be reconciled to project records
Land and separately scheduled equipment are excluded
Your CPA can review service dates and deduction limits
PORTFOLIO PROPOSALS
More properties. One prioritized scope.
Group shared records, similar property types and inspection needs into a written rollout plan.
STRAIGHT ANSWERS
Frequently asked questions.
Does California follow federal bonus depreciation?+
California generally does not conform to federal bonus-depreciation rules, so separate state adjustments and schedules are commonly required. Your CPA should confirm the filing-year treatment.
Can a newly constructed rental property use cost segregation?+
Potentially. A new rental or business property can be studied after its capitalized costs and placed-in-service facts are supported. The final report should reconcile the construction records to tax basis and separate land, equipment and other costs already scheduled elsewhere.
When should I start a cost segregation study for new construction?+
Record planning can begin before completion, while detailed plans, pay applications and change orders are still available. The final study should use actual capitalized costs and the property's supported placed-in-service date rather than an early budget alone.
What construction records help with a cost segregation study?+
Keep final contractor pay applications, subcontractor detail, plans, specifications, change orders, allowances, indirect-cost support, owner-purchased equipment invoices and completion or occupancy records. The study should also reconcile costs outside the main construction contract.
Does a certificate of occupancy automatically set the tax placed-in-service date?+
Not automatically. A certificate can be useful evidence, but depreciation generally depends on when the property is ready and available for its intended rental or business use. Phased buildings and later improvements can have different dates, so your CPA should confirm the return treatment.
Can a new-construction cost segregation report be final before the books are complete?+
A preliminary review can use current project costs, but the final schedules should reconcile to the completed capitalized basis. Estimates, retainage, change orders, owner purchases, equipment and costs recorded outside the contractor pay applications must be resolved so basis is not omitted or counted twice.
AUTHORITATIVE SOURCES
Primary tax references.
Tax rules and procedures can change. These links are general references, not approval of a taxpayer’s position. Your CPA should confirm the law that applies to your acquisition date, placed-in-service date and return.
FREE PRELIMINARY PROPERTY SCREEN
Get your study quote before deciding.
Share your property details and receive an estimate or a custom scope follow up by email. No payment or card needed.